Divisional Commissioner Kashmir, Anshul Garg, today reviewed the progress on 60 MLD Sewage Treatment Plant (STP) at Noorbagh, along with other major ongoing projects being executed by the UEED in Kashmir.The meeting also reviewed progress on other proposed STPs, including a 30 MLD facility aimed at mitigating pollution in Dal Lake, a 14 MLD STP at Alluchibagh, and a 6 MLD STP to address pollution in Doodganga.During the review, the Div Com directed that all issues related to electricity supply and leakages at the Noorbagh STP be resolved by May 31 to ensure the facility becomes fully operational.



